Substructure and installation of discontinuity joint cover | Comprehensive implementation guide, technical tips, tools and methods (Agor)

In the year 1404 (2025-2026), incorrect installation of the seismic joint cover is one of the three main causes of facade cracks and water penetration in buildings above 8 stories (Tehran Engineering System Report 1404). Incorrect substructure and non-standard installation can lead to an 85% reduction in the cover’s useful life and a threefold increase […]